THE SITUATION
The Chicago Shakespeare Theater on Navy Pier was doing a major renovation on their flagship theater, The Yard. The envisioned plan for the venue was to create a space that could be configured for both large theatrical performances and more intimate productions alike. The theater wanted to create movable seating towers that could be arranged to fit the needs of the production, and be easily changed.