Die-Cast &
Mold-Injecting
CASE STUDY
THE SITUATION
An Airfloat customer purchased additional mold presses for their operation to increase productivity. Previously, they were contracting labor to change these molds about three times a day. However, with the additional presses, this would more than double their time spent changing molds. The customer needed a material handling solution that would increase productivity, efficiency, and at the same time reduce mold change times.
THE SOLUTION
The Result
The Airfloat mold changer has saved the company an extraordinary amount of time and money. Mold changes that once took about an hour are now performed in less than 10 minutes, without the use of any forklifts and/or overhead cranes. The mold changer also has reduced press and mold damage while creating repeatable precision performance.